Field Execution Management
Plan

INEIGHT PLAN
InEight Plan provides you with a field-proven methodology for engineering and construction work planning, packaging and quantity claiming with rules of credit.
From complex, multi-week work packages to daily crew plans, InEight Plan simplifies the process of planning any scope of work along with the required resources, such as labor, equipment and materials. Work plans can also include safety, risks and environmental information to ensure that field personnel have full visibility to important issues that impact performance.
Simplify the Work Planning Process

COMPILES KEY INFORMATION IN ONE PLACE
to efficiently organize and communicate the work
DEFINES THE SCOPE OF WORK
by referencing WBS items, cost codes and components
LISTS SPECIFIC LABOR, EQUIPMENT AND MATERIAL REQUIREMENTS
to ensure the right resources are available when needed
DEFINES PRODUCTIVITY GOALS
to drive top performance
MANAGES RISK USING TOOL BOX TALKS
to call out quality, safety, environmental and other issues
ENABLE A REVIEW AND APPROVAL PROCESS FOR PLANS
Accurately Break Down Work

DEFINES APPROPRIATE METHOD FOR TRACKING QUANTITIES
based on the contract
UTILIZES WEIGHTED RULES OF CREDIT
for quantity claiming and progress measurement
ENABLES QUANTITY CLAIMING AT THE COMPONENT LEVEL
GETS REAL-TIME PERCENT COMPLETE STATUS
as plans are executed
Field Engineer
I need a way to keep track of the project progress at a level of detail below the cost code. Doing that with spreadsheets is an error waiting to happen, and then someone still has to update the cost system manually.
Cost Engineer
When I put together a pay request I need backup to justify the quantities I’m billing for. It’d be great if there was an easy way to provide a detailed summary of what has been installed on the various pay items to submit with the request.
Program Manager
To mitigate risk, it’s critical that we collaborate effectively with our contractor partners and have visibility into the planning and packaging of the work. We need a system that automates that entire process.